Hang drywall on walls and ceilings, cutting to fit. Patch drywall to remove any seams and fill gaps. Support activities at all Swinerton job-sites as directed.
Requirements
- Read blueprints and other specifications to determine method of installation, work procedures, and material and tool requirements.
- Trim rough edges from wall to maintain even joints, fit and fasten wallboard or sheetrock into specified position
- Measure and mark cutting lines on framing, drywall, and trim
- Install blanket installation in-between studs and tacks plastic moisture barrier over installation
- Assemble and install metal framing and decorative trim for windows, doorways and vents
- Lay out reference lines and points, computes position of framing, and marks position, using chalk line
- Suspend angle iron grid and channel iron from ceiling
- Install horizontal and vertical metal or wooden studs for attachment of wallboard on interior walls, using hand tools
- Cut metal or wood framing, angle and channel iron, and trim to size, using cutting tools
- Inspect furring’s, mechanical mountings, and masonry surface for plumbness and level, using spirit or water level
- Layout walls from gridlines
- Fabricate box headers and king stud assemblies
- Attach framing to floor using powder actuated fasteners or screws
- Frame window and door opening systems
- Build and install box headers
- Frame for openings for mechanical and other openings in accordance with structural drawings
- Ensure walls are level and plumb
- Install door jambs in framing as required
- Frame block-outs for doors, windows and other openings
- Install access panels in framing, black iron ceiling systems, grid ceiling systems, drywall, sheathing or cement board in accordance with specifications or local building codes
- Install flashing at windows and doors and sound and fire caulking as required